The Approval of the 2027 Investment Program
UC "Kremenchukvodokanal" Informs on the Approval of the 2027
Investment Program
In compliance with Order No. 191 of the Ministry for Communities and
Territories Development of Ukraine dated August 19, 2020, "On Approval of the Procedures for
Developing, Agreeing, and Approving Investment Programs of Business Entities in
the Fields of Heat Supply, Centralized Water Supply, and Wastewater Disposal,
Licensed by the Council of Ministers of the Autonomous Republic of Crimea,
Regional, Kyiv, and Sevastopol City State Administrations," the
Executive Committee of the Kremenchuk City Council of the Kremenchuk District
approved the 2027 Investment Program of UC "Kremenchukvodokanal" by
Resolution No. 2846 at its meeting on November 12, 2026.
The measures outlined in the 2027 Investment Program are planned to be
implemented for a total amount of UAH
42,213.00 thousand (excluding VAT), funded through the following
sources:
·
Depreciation charges: UAH 19,826.53
thousand (excluding VAT);
·
Other attracted funds: UAH 2,051.13
thousand (excluding VAT);
·
Production investments from
profit:
UAH 20,335.34 thousand (excluding VAT).
Water Supply:
1. Execution of
contractor works for the engineering project "Major Repair of the External Water Pipeline (600 mm diameter)
along Lesi Ukrainky Avenue (Quarter 274) in Kremenchuk, Poltava Oblast"
– UAH 7,484.54 thousand
(excluding VAT).
2. Preparation of
design and estimate documentation for "Replacement
(Major Repair) of Cold Water Supply Pumping Equipment at the Central Heating
Substation (CHS) of Quarter 274 in Kremenchuk" – UAH 310.00 thousand (excluding VAT).
3. Preparation of
design and estimate documentation for "Replacement
(Major Repair) of Pumping Equipment at the Third-Lift Pumping Station of UC
'Kremenchukvodokanal' at 35A Heroiv Mariupolia St." – UAH 248.32 thousand (excluding VAT).
4. "Urban Infrastructure Project" – IBRD loan repayment – UAH 3,629.86 thousand (excluding VAT).
Wastewater Disposal:
1. Execution of contractor
works for the engineering project "Major
Repair of the Emergency Section of the Gravity Sewer Collector along Levka
Lukianenka St. in Kremenchuk" – UAH 6,048.13 thousand (excluding VAT).
2. Acquisition of an
ATV-11/2 dump truck equipped with a HIAB CLX 16 CL B-2 loader crane – UAH 5,445.54 thousand (excluding VAT).
3. Preparation of
design and estimate documentation for "Major
Repair of the Emergency Section of the Gravity Sewer Collector at 1 Peremohy
St. in Kremenchuk" – UAH
290.00 thousand (excluding VAT).
4. "Urban Infrastructure Project" – IBRD loan repayment – UAH 16,705.48 thousand (excluding
VAT).
Administration
of UC "Kremenchukvodokanal"