The Approval of the 2027 Investment Program

Messages

UC "Kremenchukvodokanal" Informs on the Approval of the 2027 Investment Program

In compliance with Order No. 191 of the Ministry for Communities and Territories Development of Ukraine dated August 19, 2020, "On Approval of the Procedures for Developing, Agreeing, and Approving Investment Programs of Business Entities in the Fields of Heat Supply, Centralized Water Supply, and Wastewater Disposal, Licensed by the Council of Ministers of the Autonomous Republic of Crimea, Regional, Kyiv, and Sevastopol City State Administrations," the Executive Committee of the Kremenchuk City Council of the Kremenchuk District approved the 2027 Investment Program of UC "Kremenchukvodokanal" by Resolution No. 2846 at its meeting on November 12, 2026.

The measures outlined in the 2027 Investment Program are planned to be implemented for a total amount of UAH 42,213.00 thousand (excluding VAT), funded through the following sources:

·         Depreciation charges: UAH 19,826.53 thousand (excluding VAT);

·         Other attracted funds: UAH 2,051.13 thousand (excluding VAT);

·         Production investments from profit: UAH 20,335.34 thousand (excluding VAT).

Water Supply:

1.    Execution of contractor works for the engineering project "Major Repair of the External Water Pipeline (600 mm diameter) along Lesi Ukrainky Avenue (Quarter 274) in Kremenchuk, Poltava Oblast" – UAH 7,484.54 thousand (excluding VAT).

2.    Preparation of design and estimate documentation for "Replacement (Major Repair) of Cold Water Supply Pumping Equipment at the Central Heating Substation (CHS) of Quarter 274 in Kremenchuk" – UAH 310.00 thousand (excluding VAT).

3.    Preparation of design and estimate documentation for "Replacement (Major Repair) of Pumping Equipment at the Third-Lift Pumping Station of UC 'Kremenchukvodokanal' at 35A Heroiv Mariupolia St." – UAH 248.32 thousand (excluding VAT).

4.    "Urban Infrastructure Project" – IBRD loan repayment – UAH 3,629.86 thousand (excluding VAT).

Wastewater Disposal:

1.    Execution of contractor works for the engineering project "Major Repair of the Emergency Section of the Gravity Sewer Collector along Levka Lukianenka St. in Kremenchuk" – UAH 6,048.13 thousand (excluding VAT).

2.    Acquisition of an ATV-11/2 dump truck equipped with a HIAB CLX 16 CL B-2 loader crane – UAH 5,445.54 thousand (excluding VAT).

3.    Preparation of design and estimate documentation for "Major Repair of the Emergency Section of the Gravity Sewer Collector at 1 Peremohy St. in Kremenchuk" – UAH 290.00 thousand (excluding VAT).

4.    "Urban Infrastructure Project" – IBRD loan repayment – UAH 16,705.48 thousand (excluding VAT).

Administration of UC "Kremenchukvodokanal"

 